What a 4-hour install actually looks like
Drop cloths at 9, water back on by 1. Here's the play-by-play.

Before we arrive
We confirm the install window the day before, and we send a photo of the technician who will be in your house. You know who is at the door.
Hour 1: protect the home, rough in the lines
Drop cloths down, water shut-off located and tagged, copper or PEX runs measured for the new bypass loop. Nothing visible to you yet, this is the unglamorous part that determines whether your install lasts 25 years.
Hour 2: set the equipment
Resin tank, brine tank, pre-sediment housing, carbon block stack, placed, leveled, anchored. Bypass loop dry-fit before any solder or push-fit.
Hour 3: commission
Slow fill, leak check, program the valve to your hardness and household size, sanitize the resin, verify pressure at the kitchen tap.
Hour 4: test, clean, walk-through
We test the water leaving the new system in front of you, hand you the before-and-after strip, walk the install head to toe, and leave. No mess, no debris bag for you to take out.

